Answer Posted / parth mody
mix
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Are cruise ships built for the transatlantic run?
how many time use of plywood shuttering and IS code
What are the responsibilities of a construction manager?
what is Short bored pile foundation.
how to calculate rate analysys of 1:6 plastering 10 sq m
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How many square meter can a worker/labor demolish a structure per day?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Describe the role of independent Quantity surveyor?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
150mm bricks size how many use 4.14 m3
Define What are the materials used in building a gravity dam?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is c.g.i sheet which used for roof??