Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is mrp area and mrp group. tell me differences

Answer Posted / rashmi kant

MRP Group

The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.

MRP Area
MRP Area represents a separate organizational area for which you can carryout MRP Separately.

An MRP area can include one or several storage locations of a plant or a subcontractor. You can define MRP areas within a plant.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can any body explain me why work scheduling view is required for semi finished and finished products?

965


Mention what are the production process in sap?

1019


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

1140


What is the output of mps run ?

1041


We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?

1008


what are the problems you faced in MRP?

1808


List out the activities carried out in production planning?

945


What are the types of MIC?

1615


What does a PP Consultant do in his/her real time?

2802


Scheduling times can be defined in the material master record by?

1001


We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?

968


Difference between Routing, Ref op set, Rate routing and Ref rate routing.

2892


Explain variant configuration

1028


What do you mean by basic dates

933


Mention what are the t-codes for creating, changing and summarizing bom?

1179