Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we use RYB phase sequence? and somewhere we use UVW ?
why?

Answer Posted / vinodbagre

RYB Sequence for Transmisson & distribution system &
UVW Swquence for Motors & Generators Connections.

Is This Answer Correct ?    10 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.

4525


What is state space method ? Why its used ? Can it applicable on linear, non-linear, 1st order, higher order, homogeneous, non-homogeneous, open-loop , closed loops , stable & unstable systems ?

2086


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7770


Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?

1970


which types of relay used in acb and vcb?

2795


What technology is used in latest generators?

2156


How wire size can define in electrical wiring? What is the ratio?

2345


how can get electrical c licence.now i am working in spining mill , transformer capacity 2750KVA. SANCTION DEMAND 2250KVA. PLEASE ADVISE ME . MY CONTACT NO 09944226823

1839


how did the testing of protection relays done through current injection

2138


Usually in the L & T make MCC feeders' power circuit,we have BMR after the MAIN CONTACTOR.,can we interchange their position, keeping the control logic same???

2169


what are the sample questions asking to the test cunducting for electrical superwising lisence test?

2250


What is relation between mu(nought) and epsilon(nought)?

1590


What is marx circuit?

1170


how to determine ct ratio in ht vcb?

1890


What is the working principle of MIG welding? and its out put Voltage?

3390