Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / arunprakash g

1) BRICK CALCULATION:

SIZE: 19x19x19 nos of brick using at cum = 500nos
500 x 6 = 3000

2)CEMENT CALCULATION:

1.75 Bags using at cum
opc 410/bag so 1.75 x 410 = Rs 720/cum

3)SAND CALCULATION:

0.25 unit/cum
river sand Rs 9000/3units so 1 unit =3000
so 0.25 x 3000 = Rs 750/cum

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how water proof chemicals act in concrete to avoid leek?

2189


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1701


five benefits of using standard terminology in the measurement process

3384


How to determine thee cut length for steel reinforcement bars in R.C.C design

1506


Explain what is the release of lien?

1162


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2513


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1940


what is education Cess.

2158


what are the challenges of being a team leader and a supervisor?

3811


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2072


how to caluclate sienerge qty in construction in ap

2386


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

2234


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2586


What is absolute pressure? How absolute pressure is calculated?

1076


What is missing report and how to prepare

1475