Answer Posted / engineer
Least count of automatic level is 0.001m or 0.01ft
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is project?
Define What glue is least sticky?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what are the values of compressieve strenght?
What is the l/d ratio of cantilever beam?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is meaning of tlc
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
what is m30 in concrete tiles
Does brick grows bigger every year?
what isload waring calculation
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What is min thickness,min grade of conc & age of PQC ?