what is the consumption based planning ?
Answer Posted / shailesh patil
It uses the past consumption data to calculate the future requirement. It has no relation with the independent or dependent requirement instead it is triggered when the stocks falls below the reorder point or by forecast requirement.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are Standard keys
One component we can assign to workcenter at routing
How to create PRT master record?
What is a ‘bom’?
Explain the stock requirement list and their uses.
What is the difference between indian and us payroll?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What is the use of sap material view and list out other parameters where sap material view is applicable?
Mention how mrp (material requirement planning) types are classified?
How does sap know that an operation has components as indicated by the component allocation indicator?
What is the use of mrp list?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What are gaps? Some examples?
What is scheduling