Answer Posted / rashid imam
It is a mix where the amount of cement is lower than the amount of water present in the strata. It's often used as plaster between bricks and other pieces of infrastructure to create a tight seal. It floWs like liquid. It is also used in pavement design.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
how clculate excavated or backfilling quantity by simpson's rule
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what is castigliano theaorem
Prepare a Schedule for a Highrised building from starting stage to Handover?
howto calculate the quantities of material used in fly ash brick after finding the volume??
pls give me ans to ACT formula cube testing porpuse
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is min thickness,min grade of conc & age of PQC ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What are the advantages and disadvantages of using plastic and timber fenders?
what is the relation between pitch of steel and depth of slab?