Answer Posted / gschauhan
Total estimate of bricks,cement,sand,fine agg. and labour charge for 180sq.foot room not include gate and window.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how many time use of plywood shuttering and IS code
what is the calculation of raw material for 0.35cum of m-15
How to calculate material and labor required for 100 m2 plaster?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is the biggest dam in america?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
how to tie 10 legged stirrups
What in your past experience or education prepares you for the position for which you are applying
what is Bearing Capacity,How to determine it?