Answer Posted / s.p. patel
control valve is control through pneumatic and electrically like that positioner and i/p converter but mov control through only electrical and different types cards use mov use in generally large pipe line size mov means motorized operating valve
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
What is the diffrence between digital signal processing and discrete signal processing?
A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?
give me all the details about the interview and which type of question being asked
If we increase only P what will be controller action ?
hi,i am doing 3 year in electronic and instrumentation engineering. what type of aptitude questions will be asked in a core industries and how can i improve my skills in instrumentation?
Can anyone send most commonly asked interview question in Oil & Gas industry
what is stroke check for field instument transmetter's & AOV's
How to calibration a control valve?
Explain bernoulli’s theorem. State its application.
please send the drdo exam paper
how to calibrate 0- 150 psi presure gauge by dead weght tester
what is surge and how is it prevented, what is the purpose of bypass valve across AS valve.
applications of plc in printing and packaging?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What is 3 selection available when configure the burnout protection for controller