why we do multiply 1.54 for dry volume of concrete?
Answer Posted / subhas bera
This is experimental value we dont calculate accurate value.it is assume for 1m3 conc when we convert wet to dry 1.64 is multiply. Cause some vol of conc is reduce and some wastage it is may be not.
Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
why +1 to be followed for calculating the no of bars in BBS. Please explain
How to hide dimensions in autocad?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
in the construction of residential building what type of tank are used?where?why & what is its purpose?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
In earth work 1300 cum soil how to calculate how many liters require in water
what energized you to complete your course?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
what is differences between ferrock and concrete ?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
procedure for preliminary selection of size of column of 5 storey building
What year was the keystone power plant in Indiana County constructed?