why we do multiply 1.54 for dry volume of concrete?

Answer Posted / subhas bera

This is experimental value we dont calculate accurate value.it is assume for 1m3 conc when we convert wet to dry 1.64 is multiply. Cause some vol of conc is reduce and some wastage it is may be not.

Is This Answer Correct ?    2 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1581


in 100 cft = 1350 bricks in 100 cft = ? bloks

2479


Why Vitrified tile are getting pop up.

651


in the earthquqke the profile of water on dam is parabolic or not

1584


mix design procedure for 1:6 cement mortar

1841






Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

1909


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

772


What are the reasons for geotechnical site investigations in uganda?

752


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

1718


What is meant by solid geometry?

732


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2036


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12862


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2105


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2844


How to do base isolation for RC framed structure using ETABS software?

3830