why we do multiply 1.54 for dry volume of concrete?
Answer Posted / subhas bera
This is experimental value we dont calculate accurate value.it is assume for 1m3 conc when we convert wet to dry 1.64 is multiply. Cause some vol of conc is reduce and some wastage it is may be not.
Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
in 100 cft = 1350 bricks in 100 cft = ? bloks
Why Vitrified tile are getting pop up.
in the earthquqke the profile of water on dam is parabolic or not
mix design procedure for 1:6 cement mortar
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What are the reasons for geotechnical site investigations in uganda?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is meant by solid geometry?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
How to do base isolation for RC framed structure using ETABS software?