What is the rating of your capacitor bank at your company.
Answer Posted / kg
50 and 100kvar
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define rise time.
what kvrah y we need to take the readind of that
What is the types of HT motor testing
what is the setting of locked rotor in HT motor ? (answer expecting in percentage)
Why Neutral Isolation is required?
What will happen if i replace a inductive proximity switch with photo sensor in a machine?
previous year paper of ntpc bhel for degree in electrical enng
How to calculat the ratio of HT\LT in energy meter
how i chosse capacitor bank if my energy meter is 48 kvr? tell me capacitor bank chossen formula?
What do you mean by reach and reach the point of the relay?
Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
how can maintaince the acb contactor moveing and fixing kit
Draw the equivalent circuit of crystal oscillator?
What is the name of the winding to which supply is given?