Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why chairs are provided at slab?

Answer Posted / rakesh shivaram

To maintain the thickness of the slab and also act as a cover to the top reinforcement of the slab

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much cement and sand required for 9"brick wall per square metre

2961


why we create short columns under grade slab?

2356


why does the most of civil engg is not intersted to going for teaching field?

2131


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

1167


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2665


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

2245


How to do bbs in excel format

2271


how can i calculate cement in brickwork

3996


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1691


What is the meaning of a blue land surveyors flag?

1523


How do you change a dimension value in solidsworks?

1292


What are the methods of measurement? Describe it shortly

2284


yasser arfatcompleted his degree in civil from which university

2317


IS code for grade of concrete for bamboo lintel????

2214


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2824