what is a mix design GSB and WMM
Answer Posted / raju
40mm
20mm
Dust
Cement
| Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
How to decide/consider the grade of bitumen for dbm.
how many types of survey and what are levelling instrument?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Form where IS456 is adopted in 1978?
what is mean by reestimation?
For what building Built-on balconies are preferable? What are the advantages?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
why does the most of civil engg is not intersted to going for teaching field?
The largest size of paper used in plotter to print the drawing made by Autocad .
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why building got air crack? if it get in one particular are what is means?