Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

difference between a four point starter and three point
starter

Answer Posted / anil kumar behera

In 4point starter a brass arc is present which is not present In 3point starter. A protective resistance is present In 4point starter which is not In 3point starter.

Is This Answer Correct ?    8 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how is the testing of an REF relay? what are the test REF circuit having?

1939


What is difference between unity power factor wattmeter and upper power factor wattmeter? In short circuit test of transformer the wattmeter used is unity power factor type or upper power factor type wattmeter?

2716


How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?

1784


can anyone give an idea about dia calculation in cold rolling mill

1583


how to test YNyn0 vector group in transformer?

3805


What is the different types of cable & current capacity of cable

1886


can the measured percentage error during calibration of single phase energy meter be negative?

2352


What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?

1893


HOW TO CALCULATE THE REGULATION OF 100 AND 25 KVA TRANSFORMER

1893


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2581


How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?

2175


is it necessary to earth the rmu before cutting off the transformer winding?if yes why?

1876


What kind of preventive maintenance are there for transformer?

2209


how to calculate the earth mat design in 132 kv substation yard ????

6170


How shall i select the value of capacitor or inductor in a system?

1858