Answer Posted / viji
On curves, the outer edge of road is raised with respect to inner edge. At curve the vehicle experience a jerk because of centrifugal force. To counteract this force super elevation are provided at curves.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Tell me about triple point of water.
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
What ingredients with% found in ppc cement??
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
in 100 cft = 1350 bricks in 100 cft = ? bloks
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Explain moment of inertia and its importance.
How much does the leaning tower of pisa lean?
Define What is the origin of name Railway Sleepers?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How to make tiles floor step by step procedure?