Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?

Answer Posted / s k majumder

Meter Cubic wet volume = 1*1.52 =1.52 Meter Cubic dry vol.
= 1.52*35.33=53.70 cft

Hence for M-20 where nominal portion 1.1.5.3
Total volume comes to (1+1.5+3)= 5.5

Therefore Dry volume for one cubic meter.
Cement= 53.70/5.5=cft= 9.76cft= bag= 7.81 bag=8 bags
sand = 9.76*1.5=14.64 cft
stone = 9.76*3=29.28 ct

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

2395


how to conversation of all construction material in to brass

5500


plz.show development and anchorage length in simple diagram.

2591


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1686


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

2269


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

2294


What is meaning of FREE STANDING STAIRCASE ?

3038


what is the basic difference between Coloumn & Shear Wall

2221


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

2091


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1993


How can explode a block?

1132


how lap length is increased with increase of Grade of steel?

27075


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1844


how to caluclate sienerge qty in construction in ap

2408


How to plan a project

2309