What is Workload? Can anyone explain in detail?
Answer Posted / yugandhar.k.c
Load distribution across the identified scenario's of AUT called Workload model.Workload model of an application ensures that how this application is used in production environment
workload model is of two ways
1.Business workload
2.Infrastructure workload
1.Business workload:Set of user actions performed with in the test to achieve the business&Goals.
2.Infrastructure workload:Amount of resource used by the business scenario's to achieve their desired load.
Eg: CPU,Memory
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the need of checkpoints in lr?
How you develop the database vuser script?
During the load test, what is the optimum setting for logs?
What is gui vuser and on which platform it will run?
What are different types of vuser logs which can be used while scripting and execution? What is the difference between these logs? When you disable logging?
Difference b/w 9.1 and 9.5 Versions in LoadRunner?
What the vuser script contain?
How vugen create a vuser script?
Where are automatic correlation options set?
What are the documents your using ,and how your distibute the users
How to handle the encrypted values in correlation. please send me example with explanation
What is the number of graphs you can monitor using controller at a time? What is the max of them?
What is the difference between overlay graph and correlate graph?
What is difference between manual scenario and goal oriented scenario?
what are the risks you faced with loadrunner