If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).

Answer Posted / rk

For increase the cbr must be added bending material like sand and granular particals for making proper cbr.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Slab quantity 

1609


what is mean by reestimation?

1362


how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1449


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1691


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1773






Aptitude, reasoning, quants, verbal and technical question

995


Define What is diversion tunnel in a dam?

754


What is Time period of a building and its relation with frequency ?

747


1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7575


Are you ready to relocate with your immediate family to United States as a new employee?

4877


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2148


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

779


What year was the keystone power plant in Indiana County constructed?

733


How to calculate construction cost of residential building in mumbai

1475


what are the ffactors you considered choosing the course?

1697