If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / rk
For increase the cbr must be added bending material like sand and granular particals for making proper cbr.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Slab quantity
what is mean by reestimation?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
Aptitude, reasoning, quants, verbal and technical question
Define What is diversion tunnel in a dam?
What is Time period of a building and its relation with frequency ?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
Are you ready to relocate with your immediate family to United States as a new employee?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
What year was the keystone power plant in Indiana County constructed?
How to calculate construction cost of residential building in mumbai
what are the ffactors you considered choosing the course?