What is the use of IGBT in UPS & its working??????????
Answer Posted / anil kumar
It also has excellent forward & reverse blocking capabilities.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In Designing the rating & accessories of a MCCB how to choose the type of releases..means what is the basis for selecting, thermal magnetic, electromagnetic & microprocessr based releases
What are the advantages of using distance protection schemes as opposed to normal overcurrent/ earth fault protection on high voltage feeders.
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
What is the Surge for 1.1 Phase Induction Motor(For Eg.1Hp) 2.3 Phase Induction Motor(For Eg.1Hp) 3.AirConditioner(For Eg 1Ton) 4.Refrigerator(For Eg 180Ltr or 160kW) 5.Induction Cooker 4. Ceiling Fan
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
What happens when ac supply is given as excitation voltage instead of dc supply
Earth bits close or open. Which is correct
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
Is it true that in the 3 phase transformer, the limbs of the core are at 45 dgrees to each other. if true, why?
We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's
what is the basic construction diffrance between servo motor ans sqiralcage induction motor
why output is out of phase in case of common emitter?
at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.
How to synchronization will be done between two DGs ?
what & how to check the lightning arrester