Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is value of S.F at Point of contaflexure?

Answer Posted / hemant sahu

at point of contraflexure bending moment changes its sign from positive to negative or vice -versa.
at this point sgear force is zero.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why the finite element method is lower bound solution?

2960


what are the types of design? which type of method is used at what type of design & why?

2186


Give me an example of a time when something you tried to accomplish and failed.

3031


all technical question

2261


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2173


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

6363


How does a traffic light signal work ?

2295


How to increase a bearing capacity of soil?

1133


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

2331


what will happen if one could not properly follow the spacing of slab reinforcement bar?

2048


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2568


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

2079


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2130


400 ku d/c clearess ketan hota hai?

2032


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1986