when we create a c.m.r we have four partner functions that is sp,sh,bp,py which one is mandatory? and if sp is mandatory but i want bp as mandatory, how its work? please tell me
Answer Posted / ~nirali
In partner determination procedure --> sales document header --> partner functions in procedure* --> check the partner function BP as Mandatory.
*[There will be 2 columns(check boxes) inside partner functions in procedure : 1.Non-modifiable
2.Mandatory
]
after u check the Mandatory box for BP then it will become Mandatory.
Hope this answer helps.
Plz correct me if I m wrong.
Thanks :-)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the central organizational element in purchasing?
What is the Difference between WM and EWM?
what is settlement profile...when i m doing varient configuration i am facing this problem while creating sales order plz explain me......
client wants to have sales of particular material area wise. How to write functional spec for this
Where do you define the terms of payment for a customer?
how to define and assign value for mini oder value (amiw) condition type and which field cateloge we suppose to choice in v/03?how amiw and amiz work together?
How can one billing document type has 2 different number system? Basically if there are two documents belonging to same document type but for two different plants, then how come they both have different number system?
we have a situation where i am about to design one process where only maintainence is taken care of keeping the existing product +services process intact ...Do you know how do i proceed???? where this process is a VAT free
Where is the logic that controls this and how do we change it?
What is product hierchey and where you assign in material master?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
What is ‘consignment stock processes'?
What are the different criteria on which account determination is dependent during customization?
Can anyone walk me through the process of what happened when you do the post good issue in delivery? Moment type 601, let’s take that as an example, what happened in SAP? Suppose 601-moment type is posted in SAP, what happened when you do PGI (Post Goods Issue) as any account happens and if yes then what kind of account posting happens. please tell me, after PGI is completed what happens?
What copy control is and when copy control transition can be done? In what manner copy control transition can be done?