how to calculate the number of cement bags for basic construction..?
Answer Posted / er. vaseem ahamad
To know the requirement of cement bags for basic construction some information is required:
Drawing and design
Dimension of structure
Type of foundation
Grade of concrete
Proportion of mortar
Type of soil
Maximum 12-15% cost needed for cement of total cost of building.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
whats is difference between anchorage length and development length
Please design 12.5m long dubbly beam
What are the advantages and disadvantages of using plastic and timber fenders?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
why the profile of shell of natural draught cooling tower is hyperabolic.
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
pls give me some basic informations in construction of a structure?
What is a tensile strength? What is the tensile strength of wood?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
significance of specific surface area of particles?
pls tell me , what is the water content