whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???
Answer Posted / dsp
The mixes of grades M10, M15, M20 and M25 correspond approximately to the mix proportions (1:3:6), (1:2:4), (1:1.5:3) and (1:1:2) respectively.
| Is This Answer Correct ? | 34 Yes | 0 No |
Post New Answer View All Answers
What is the difference between shear and tensile strength?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Define What is diversion tunnel in a dam?
Define What is unit weight of normal concrete?
How to do rate analysis for concrete work including shuttering work?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
what is shuttering co efficient?
how to calculate testing date
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What is the difference between built area and super built up area?
What is a kip?
What are advancements in civil engineering?