8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the
Column drawing please answer give with example,thankyou,
Answer Posted / sony kumar
8mm means dia. Of steel bar 2 legged means 1 stirrup & 4 legged means 2 stirrups 7" means 175mm center to center distance of stirrups
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how to calculate number of bitumen for road asphalt
Cement consumption of one cubic meter of aerocon blocks masonry?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
how to tie 10 legged stirrups
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
In which code the the maximum height of concrete casting has been explained
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Who name us Engineer & Why?
Why should pumping be not used in case of concreting work?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
List out the potential risk factors for workers on the construction site?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?