Post New Answer View All Answers
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
Why efficiency of generator is higher than motor at a particular load?
pls tell us AC plant are how do work and parts name with picture
what is the responsibility of C license holder in industry?
What is oscillator circuit?
The series field winding has low resistance while the shunt field winding has high resistance. Why?
Graphs of measuring power and speed on dc motor
What is the difference between the impedance percent and impedance voltage ?
what is Fault level? why it is calculated? how will u decide same for our plant?
What is CVT and what is relation with wave trap?
Define early construction of human being
Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA
how to electrically make connection to ferroli GN2N?
what is the differences between microprocessor and general purpose computer
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,