Answer Posted / jayaprakash g
415 stands for yield strength of steel
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
how we can find sieve #4 is 4.75mm?
what is the difference between np2 and np3 concrete mix
What are the reasons for geotechnical site investigations in uganda?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
pls mail some more tecnical qustions at msaranya2610@gmail.com
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
crank types
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
how i get all type of short type question answer about civil engg
Wat is meant by Aecron brick?