how can we differentiate the KOTA STONE and SHAHABAD STONE by vision?
Answer Posted / a.h.qureshi
After polishing 'if observed closely.you find dark green dots[net of dots] and smooth polished finish while shahbad does not give very smooth finish and pretty green dots.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Does VDF add strength to the flooring apart from preventing water ingress?
How much cement will require for 1Rmt Skirting laying
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Wats the formula of eccentric footing and how was calculated from concrete qty
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how to identify np3 pipe and np4 pipe
What Are The Different Type Of Slump Test Indications?
what is the types of surveying?which type of survey carrying for type of work?
rate analysis for cement pointing 1:4 , for 100 sq m
what is tension & compression of steel bending.
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh