how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant
Answer Posted / rashmi kant
Ist we estimate the material in t-code CK11N
THEN we do costing of the product in CK24
T-code CK4ON can be used for group costing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the use of QM control key?
Can any body explain me why work scheduling view is required for semi finished and finished products?
What is mrp controller means?
How is indian slab and us slab?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
List out the activities carried out in production planning?
What is meant by payscale structure? How did you configure the payscale structure?
Can’t one material be assigned to more than one operation in a routine?
Difference between Manual reorder point and Automatic reorder point.
Explain what is prt (production resource tools) in sap pp?
What are the parameters are there in Order type or in dependent para. config?
Explain the mrp controller and their uses.
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is MRP procedure
What is standard order type