I got a concrete base to do 2200 x 2200 x 150 mm can you tell me how to calculate the quantity of cement to use
Answer Posted / naresh pilare
mention the grade
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How much quantity water should be placed in one cubic meter area?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Explain how you can turn off the display for dimension in CAD?
why demand factor less then 1 ?
How can we demolish concrete beams?
how many types of survey and what are levelling instrument?
What is the Roll of Water Bonding under VDF road?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
How to calculate woden area in sft and Cft
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
satart to end steps by step process of building construction...? i want to planning theme accuretly
How to take labor charges for construction of 1cum of concrete?