How to calculate the Water cement ratio of reqiured
compressive Strength of concrete?
Answer Posted / mohammad raz
the density of water is 1. if we multiply the water
cement ratio with the cement being used , we will get the
amount of water. For example if water cement ratio is 0.45
and cement being used is 400 kg per cum, then the water
required will be 0.45x 400=180 litres per cum of concrete.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
how much cost of single coat 20mm thick plastering per sqre meter
Who built the sears tower?
What is the difference between Hinged and pinned in Column ends
Which are the top apps for you civil engineer?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Design a rectangular channel.
How many days should curing of plastering, brick work and concrete
why & what is perchatage we are using fly ash in concrete?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
what is the difference between replacement of cement by groundnut shell ash
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?