How can we improve the capacity of a existing foundation?
Answer Posted / civil engineer
compacted well
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Why steel rods are produced only in even dimensions?
How to check slab shuttering level.? Or check list for slab ?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Explain what is the release of lien?
What is costing in 100squre feet bricks
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what do you understand by M25 concrete
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
How can I make justification between using concrete grade c35 compare c37?
What is the use of water table & Kreb stone for drain
Define What is the origin of name Railway Sleepers?