how much % of steel use in footing, slab, column
Answer Posted / engr.forhad
Piling -0.6 to 0.8%
Foundation -0.8 to 1%
Beam-1 to 1.5%
Slab- 0.8 to 1%
Column- 2 to 3%
| Is This Answer Correct ? | 1 Yes | 10 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is the exact dia of 8swg and 10swg gabion wire
How many square meter can mason layout chb per hour
What you understand by building codes?
what is thumb rule for calculating the size of ISMB required for a particular length of span
what are the proper pipes for salt water line
What are the different methods for drawing an arc?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
sir how can we find the cement and sand required for making 4" drop
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What are the common ways of demolition?
How to calculate 1 brss for RCC work