Answer Posted / krishna
Tie beam is a beam which is placed in between any number of footings in a given plan and the load will bare equally on beam and column.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
to minimize budget cost of building , what can i do
How do you prepare Material Recovery Statement for deduction from contractors bills?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is an object snap mode?
Why reinforcement done in shorter span in two way slabs
Civil engineering material testing Standard results
Slump Values for works?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
crank types
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
How many days should curing of plastering, brick work and concrete
How we calculate the service time of buildings
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is the development length given in pile?