Answer Posted / bhawani singh
(500-2*cover-2*8)+(500-2*cover-2*8)+2*12*8=1.000mtr
If cover in the column is 40 mm.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Where will be the maximum bending moment in a TEE Beam?
How do you calculate load bearing capacity of a waffle slab?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is difference between limit state and working stress method? How it is applies in building structure.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
very simple or less time consuming formula for reinforcement calculation by moment
what is the difference b/w full length and cutting length?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What are the advantages and disadvantages of lead products in construction?
How many cum of 9.5mm stone in 1 ton ?
Define What are the uses of alloys in daily life and how are alloys made?
What is rolling stock
What is the purpose of Chipping in the heavy foundation?
what else we can add rather than admixture in concrete to reduce the cement quantity?