What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / javeed
Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)
| Is This Answer Correct ? | 7 Yes | 16 No |
Post New Answer View All Answers
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the cost difference between site mix and ready mix concrete per cubic meter
how to calculate the size of triangular ring in rcc column?
how much cement and sand required for 1cum rr masonry
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
What is passive earth pressure ?
difference between fc and fc'?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What is meant by cartesian coordinate system?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
which type of instrument included in plumbing work?name of instrument?
RR masonry rate analysis
what is the formula for Mass of cement grout (Dg)=???
what are the values of compressieve strenght?