Answer Posted / ashwini
2.63
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
please send me bhel questions on rupesh.017@rediffmail.com
What is the difference between undo & redo?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
why is M30 grade Concrete use for Foothing & Column M50
punj loyed and sapurjl palanjl
Prepare a Schedule for a Highrised building from starting stage to Handover?
how many minimum admixtures are used in water froofing structures
How to calculate construction cost of residential building in mumbai
what mean By core Billing
Define Who designed the city of Washington DC?