How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

Answer Posted / prasanta singha

2.5kg/cm2

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What will you do if you encounter problems like accidents?

623


What are the RISKS during the project construction?

1748


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2151


what is w/c ratio in dry lean concrete for m10 mix design

8001


how many shuttering material required for 1000 sq.m built up area.

1896






hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1976


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1601


types of laps in column

1932


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1441


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1731


Pls explain me about tension and compression in a flat slab

1605


Explain what is zoning permit?

790


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1001


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3361


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1705