what are the advantages of PID controllers compared with
those of a PLC
Answer Posted / alok0207ac@gmail.com
Generally, PID control algorithms, using in PLC controllers withmany anolog inputs and outputs, enable control of many control loops. It is a great advantage. In my opinion the only disadvantage it is usually related to the tuning methodology. It is connected with the brand of the PLC and its type e.g. nano, micro etc. Sometimes an autotuning procedure doesn't exist e.g. VersaMax Micro from GE and then sometimes a manual tuning process is difficult.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Give the safety precaution when working in a high place.
What is the felding arrangment of the boiler
If any machinery or transmission needs periodic ana regular lubrication . what is the best method to give it?
what is the three types of combustion-control system?
how much efficiency loss will tool place in a steam turbine due to low vaccum?
How Much static pressure as per NFPA standard is required in the hydrant line?
What are the causes of low compression in the main engine?
What is gd&t?
difference between 1st angle and 3rd angle projection
Why large boilers are water tube type ?
What is the importance of workshop?
I am Sunny..I have completed B.Tech(Mechanical).can i apply for Probationary Officer Post in Syndicate Bank 2010.Is that they hire engineers for PO Post?
what will be the min curvature ratio for Round Bar dia. 1” size in material grade AISI 4330, Yield strength 115KSI Tensile 140KSI?
What type of boiler does not need a steam drum ?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb