Answer Posted / anil kumar
Slump Cone Test
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to calculate testing date
how do we design mix ratio?
What is bylayer?
What is Base Shear ?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
how to calculate rate analysys of 1:6 plastering 10 sq m
how to identify np3 pipe and np4 pipe
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how to caliculate required amount of cement and sand required for 1cu.m.
How many % we consider for lap for reinforcement for estimates
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
about higyway engineering
how to prepare site mix design