what is the difference between stress and pressure??
Answer Posted / manaranjan
Stress=forceunit area
Pressure=forcearea
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is the theoritical percentage of concrete cubes testing per day?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
what is the use of water bar in water tank and is this an extra item in estimate?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
what is features of a typ-ical modern air-conditioning installation?
Minimum and maximum size of the building components
How do we calculate absolute pressure?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000