Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
Answer Posted / d rajiv
cement 0.5 bag
bricks 16 nos
steel 03 kg
sand 03cft
aggregate 0.9cft
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you calculate load bearing capacity of a waffle slab?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is pouring and explain
How can i do RCC rate analysis?
What is meaning of tlc
What is difference between limit state and working stress method? How it is applies in building structure.
in design case of structural member best suitrable percentage of steel limit is what
What is Critical path in Ms-Project ?
Explain the design for rcc multi-storied building?
How many litres of water used for curing of 1000sqft of slav
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How can we convert weight batch to volume batch for m30 mix
trapozidal
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?