in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
Answer Posted / shorif
0.45 to 0.49 Per bag
for example = 50 kg x 0.49 = 24.5 liter
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate material and labor required for 100 m2 plaster?
punj loyed and sapurjl palanjl
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
what do you understand by M25 concrete
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is the different type of slump test indications?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
In block work seawalls what is the purpose of slip joints?
What are the benefits of rcc pipes over steel designed pipes?
what is the criteria for the finalisation of pavement thickness in road project?
States some of the commonly used commands in cad software’s?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
how to identify the failure of building by expansive soils
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in