Where do we use singly and doubly reinforced beam in construction purposes
Answer Posted / menaka
When there's chance for reversal of stresses we go for doubly reinforced sections to increase moment of resistance
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
How do You Maintain a structure after getting cube test of low strength.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
what is a well
What are some facts about concrete?
what is the ingredient value of 40mm and 20mm aggregates?
Why are steel plates inserted inside bearings in elastomeric bearings?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
How is the leaning tower of pisa supported?
Define What is the origin of name Railway Sleepers?
it is a corrected question." make a list of engineering property(properties) of soil.
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting