one litre of shuttering oil how much area covered the
shuttering?
Answer Posted / mashx69
Check this site for complete shuttering material req.
http://civilatwork.blogspot.in/2013/07/calculations-of-shuttering-material.html
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
2. What are the advantages of your present job, things you like about it?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What is .Dwg?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
will fix foundation bolts at site with out template is there any procedure?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
can you provide a link for manual design of building?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
how we can find sieve #4 is 4.75mm?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI