Answer Posted / satvinder singh
lean concrete is mix of low cement content usually 1:12:14 is used at sites for base fillings and base for pcc in RCC roads
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
what is the meaning of 40/20 src
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
What is the coeffiencent Friction Angle between Steel and Ashphalt?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is reinforced concrete?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
how to calibrate the RM 800
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
Difference between lime, distemper and plastic emulsion?
how to prepare site mix design
what is the composition of good brick ?