Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

tell me about Woodward505 Function as a point of Instrument
Engineer.

Answer Posted / muataz

how to use 505E for standard steam turbine

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty

2364


Linear amplifier.

2077


what is the procedure of belt scale calibration?

2482


What is exact difference between the panel earthing and system earthing in DCS system. What is the value of resistence.

2712


What are different types of orifice plates? State their uses.

1203


In Safe Guarding test what means by "Failed to Danger" ?

2214


TEMPERATURE VARIATION FOR FREQUENTLY.

2110


Please can anybody help for control valve sizing step by step procedure?

2195


Do you have reference list?

1891


what is zero and span ?

1723


what is the PC interface and software for connection to ABB logic module “ LM011-CE18RAC “ ( for Programming ) ??

4082


How to Calibrate Vibration Probe (Axial, Redial) in field

1185


why we r opening HOT BYPASS valve during startup of a compressor?

2165


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2219


How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?

2645