Answer Posted / menaka
We can't roughly say mix proportions beyond M25..so for M30,M35,M40 we have to go for design based on the properties of materials
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
why demand factor less then 1 ?
how much one carpenter can doing shuttering of slab in one day
How to calculate quantity of plum masonry in 1:3:7
How to fix toll charge for a particular vehicle at toll booths in a highway?
how much cement sand n bricks required in im3?and how much in plaster?
How to come 1.54 from dry to wet concrete?
What is bmc stands for in bmc software?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Explain why concrete barriers have curved surface profiles?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
give me the rate analysis for Bituminous Macadam and SDBC
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?