Answer Posted / michael
Contractors are used to make and break high current circuits basically in industrial motors
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
During Starter Panel Com missing I Found The Main Incomer 40Amp MCB 10KA Trip When Motor Change Star To Delta Motor Rating 20HP BUT When We Use Same MCB To Other Motor It Does Not trip Or What Is Necessaries for Star Delta Starter MCB SFU MPCB OR MCCB And What are The Breaking Capacity of MCCB in the Motor above 15HP
If VFD is On but no starting commond on it. so how many outpout voltages of VFD
how do you choose the cable size as per amps rating & the voltage drop for the same.
why the value of k is more in shell typr transformers?
how maney type tempereture measurement ?
What is the method of estamating of cable, CB,MCB ?
What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?
my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking
which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?
Why Neutral Isolation is required?
how hydrogen cooled alternator undergo maintanence ? that is hydrogen when come in contact with air can result into explosions .
WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?
Can u tell me design of switch yard
why the voltage and current in a long transmission line are called travelling wave?
State any two nuclear power stations in India, with their generating capacity.