Answer Posted / vijay kumar negi
beam bottam to slab bottam we make beam sides .
beam bottam to slab bottam langth we called line killa.
like beam{300*500} slab thikness is .125mm than our line killa is .375mm.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is thumb rule for calculating the size of ISMB required for a particular length of span
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What is change order request?
what is work of planning deptt. in any construction compny (in road project)
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is the different type of slump test indications?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What is meant by a context menu in a cad software?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
how to estimate material requirement for an area of house in square feet?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
what is the tensile strength of 10swg and 8swg gabion wire?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL