beam bottam to slab bottam we make beam sides .
beam bottam to slab bottam langth we called line killa.
like beam{300*500} slab thikness is .125mm than our line killa is .375mm.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Is there the dry coefficient of cement is constant?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Define mirror?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
What is the use of extruded feature in solidsworks?
What is the difference between Grade I, II and III of GSB?
What is the worlds largest concrete dam?
how to identify the failure of building by expansive soils
why +1 to be followed for calculating the no of bars in BBS. Please explain
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What is the Roll of Water Bonding under VDF road?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
what is the basic difference between Coloumn & Shear Wall