if i found voilation at the site so 1st of oll i wud lyk 2 inform my seniors n oll responsible prsons in written form who r jointd with dis work......
dn i think abot to do smthing wid the help of their suggesions at the site.....
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the challenges of being a team leader and a supervisor?
what is column foundation
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What are the reasons for geotechnical site investigations in uganda?
How to calculate paint drums per meter square
five benefits of using standard terminology in the measurement process
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
For the construction project what capital cost has to be taken in consideration?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How and where are aqueducts built?
How much quantity water should be placed in one cubic meter area?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What year was the keystone power plant in Indiana County constructed?